2020 Q1 Extruder

1234567891011121314151617181920
Across
  1. 3. Step one of using a fire extinguisher is _____ _____. (two words)
  2. 7. Three solutions we use with low flash points are alcohol, acetone, and ____.
  3. 9. The personal protective equipment (PPE) worn when cutting is _____.
  4. 12. The symbol is at the center of our Operating System poster is a ____.
  5. 14. Our Vision Statement says we are “Working Together. Doing It ______.
  6. 18. “E” in EPIC values stands for _______.
  7. 19. The “A” in EMEA sales region stands for ________.
  8. 20. The first product shipped from CSC was TFE ____ ____ (two words)
Down
  1. 1. In industrial settings one in ____ workers are injured within the first 30 days.
  2. 2. When using a fire extinguisher, stand ____ feet away.
  3. 4. The Japanese word for “mistake-proofing” a machine is _______.
  4. 5. Zeus’ #2 priority is _________.
  5. 6. To douse a fire, ______ the extinguisher’s output from side-to-side
  6. 8. Zeus’ #3 priority is ___ ____ _____. (three words)
  7. 10. When fighting a fire, always keep the _____ at your back.
  8. 11. To put out a fire, aim at the extinguisher’s output at the ___ of the fire.
  9. 13. In 1996, Zeus launched its first website and the _____ plant opened.
  10. 15. The name of the Zeus technical e-newsletter is ______.
  11. 16. Zeus’ #1 priority is _________.
  12. 17. The word inside the triangle on the Operating System poster is _____.