World Quality Week 2024
Across
- 5. This is done on a regular basis with any equipment that is critical to quality (i.e. scales, temperature transmitters, etc.)
- 7. Defective or non-conforming material that can be processed again to bring into specification.
- 10. A Japanese term that means "to go to the place where things happen"
- 11. This _____ Disposition sheet allows us to properly move and use material which is not in unrestricted.
- 12. The instructions that inform operators how to make batches
- 13. Foreign Object ______, or FOD, is objects or materials which could accidentally enter a batch, causing contamination
- 16. Who owns Quality
- 17. This purge keeps moisture contamination, which can be a big problem for our customers, from the headspace of a container
- 19. The recipe
- 20. This chart helps us see what issues are having the biggest impact on our daily performance, or "tall bars"
Down
- 1. What 3 numbers and a letter must be present on any sample label?
- 2. When it comes to continuous improvement, this is a way of life!
- 3. When making a paperwork correction, you must have a single-line cross out, write ____ and date
- 4. This 4-letter acronym describes how the first lot of raw material received at the plant must be used first in a batch
- 6. Total good pieces produced the first time/total produced
- 8. All LWI and LOP documents should be stored in this database
- 9. the length of time for which an item remains usable and can be consumed
- 14. ____ Parts Per Million is a key quality metric, which measures products which did not meet customer needs and expectations.
- 15. This program provides us with the quality tools needed to achieve NO quality complaints or issues for our customers.
- 18. Non-conforming material that cannot be salvaged