Site Survey Results Crossword Activity
Across
- 4. Vendor covers all cost associated to the construction.
- 6. Site is considered ready for service installation
- 7. Inspection of an area where the service is required. Technicians/engineers will determine if a construction is needed, precise a demark , verify access or any site requirements to make a site serviceable.
- 9. Survey that provides an assessment of the area by diagnosing coverage and serviceability remotely.
- 10. Planned finish date of the construction.
Down
- 1. Survey that analyzes the signal strength, coverage and access points within a building.
- 2. The customer is responsible for completing them during a specific period of time
- 3. Vendor is not able to provide service
- 5. The customer is responsible to pay full contribution or part of the construction
- 8. Document that defines the scope and details of the work that needs to be done.