2nd Crossword Puzzle - EVR Systems Engineering Newsletter

123456789
Across
  1. 6. Top-down risk analysis
  2. 7. Type of requirement that cannot be used to reduce initial risk acceptability determination
  3. 8. Risk analysis performed after risk mitigations are in effect
  4. 9. Human factors validation study whether use errors occur when analyzing critical tasks
Down
  1. 1. Fault management principle where system continues operating without interruption despite the failure of one or more of its components
  2. 2. Type of fault depicting a temporary, self-correcting failure that is likely to succeed if repeated
  3. 3. Team tasked with final decision-making authority for whether issues should be fixed, rejected or postponed.
  4. 4. Team tasked to review if a submitted issue contains appropriate minimum information to proceed to investigation, assess impact and perform an initial recommendation
  5. 5. Process of re-running previously passed V&V tests after a design change