40 Hour Site Safety Manager
Across
- 2. Type of cleaning required on unenclosed perimeters (vertical netting).
- 6. All worker sheds shall have _________detectors according to the building code.
- 7. _______shall not be allowed to be accumulated on scaffold platforms.
- 9. The use of_____scaffolds in NYC is prohibit.
- 12. At minimum, how many individuals must be present during a tower crane safety coordination meeting?
- 14. Number of topics mandatory to all tower crane safety meetings.
- 16. Landing and placing loads procedure. The bundle of decking is placed on a minimum of_______steel joists.
- 17. Number of sidewalk shed inspections required by code.
- 18. What kind of signs are prohibited on all protective structures (sidewalk sheds)?
- 19. One of the most dangerous phase on concrete operations according to DOB.
- 21. Required excavation design drawings available onsite.
- 22. Distance in feet scaffolds must be from uninsulated electrical lines less than 50 kilovolts.
- 25. Type of debris not allowed to accumulate.
- 28. 3316-_________lifts shall require a permit from NYC FDNY.
- 29. All design drawings shall be complete and of sufficient....
- 31. All online training must be actively ________according to 3321 Section.
Down
- 1. Project information panel minimum height in feet above the ground (Fence Sign).
- 3. SSM/SSC shall be designated to ________safety compliance.
- 4. Device used to measure wind speed.
- 5. SST hours required for construction workers in NYC.
- 6. At minimum, how many items must be on design drawings for excavation (SOE)?
- 8. Daily inspection of___________ shall be conducted by a competent person throughout the building.
- 10. What kind of format of manufacture specifications are now accepted by DOB?
- 11. A definition of incident according to DOB.
- 13. If wind speed is forecast to exceed ___MPH, all assembly/Disassembly of hoisting equip. shall stop.
- 15. Guardrail height requirement for ramps as per 3315 section.
- 17. NYC Department responsible for all permits related to the use of compressed gases.
- 20. CS/SSM DOB licenses are valid for_____years.
- 23. Safety zone specified in 3306 to be provided for all ___________demolition areas.
- 24. Failure to make_______documents available on site may result in SWO on demolition projects.
- 26. Safety orientations in NYC must be conducted every___________.
- 27. Who must perform a documented inspection of concrete formwork prior to placement of reinforcing steel?
- 30. Who performs the assessment of the structure prior to be demolished?