40 Hour Site Safety Manager

12345678910111213141516171819202122232425262728293031
Across
  1. 2. Type of cleaning required on unenclosed perimeters (vertical netting).
  2. 6. All worker sheds shall have _________detectors according to the building code.
  3. 7. _______shall not be allowed to be accumulated on scaffold platforms.
  4. 9. The use of_____scaffolds in NYC is prohibit.
  5. 12. At minimum, how many individuals must be present during a tower crane safety coordination meeting?
  6. 14. Number of topics mandatory to all tower crane safety meetings.
  7. 16. Landing and placing loads procedure. The bundle of decking is placed on a minimum of_______steel joists.
  8. 17. Number of sidewalk shed inspections required by code.
  9. 18. What kind of signs are prohibited on all protective structures (sidewalk sheds)?
  10. 19. One of the most dangerous phase on concrete operations according to DOB.
  11. 21. Required excavation design drawings available onsite.
  12. 22. Distance in feet scaffolds must be from uninsulated electrical lines less than 50 kilovolts.
  13. 25. Type of debris not allowed to accumulate.
  14. 28. 3316-_________lifts shall require a permit from NYC FDNY.
  15. 29. All design drawings shall be complete and of sufficient....
  16. 31. All online training must be actively ________according to 3321 Section.
Down
  1. 1. Project information panel minimum height in feet above the ground (Fence Sign).
  2. 3. SSM/SSC shall be designated to ________safety compliance.
  3. 4. Device used to measure wind speed.
  4. 5. SST hours required for construction workers in NYC.
  5. 6. At minimum, how many items must be on design drawings for excavation (SOE)?
  6. 8. Daily inspection of___________ shall be conducted by a competent person throughout the building.
  7. 10. What kind of format of manufacture specifications are now accepted by DOB?
  8. 11. A definition of incident according to DOB.
  9. 13. If wind speed is forecast to exceed ___MPH, all assembly/Disassembly of hoisting equip. shall stop.
  10. 15. Guardrail height requirement for ramps as per 3315 section.
  11. 17. NYC Department responsible for all permits related to the use of compressed gases.
  12. 20. CS/SSM DOB licenses are valid for_____years.
  13. 23. Safety zone specified in 3306 to be provided for all ___________demolition areas.
  14. 24. Failure to make_______documents available on site may result in SWO on demolition projects.
  15. 26. Safety orientations in NYC must be conducted every___________.
  16. 27. Who must perform a documented inspection of concrete formwork prior to placement of reinforcing steel?
  17. 30. Who performs the assessment of the structure prior to be demolished?