4.1 key terms crossword
Across
- 2. The identification, evaluation, and prioritization of risks followed by activities that minimizes, monitors, and controls the impact of the risk.
- 5. The SDLC phase that involves gathering information about the technology and software needs of an organization, deciding which options are most feasible, and setting timelines and deliverables for the entire project.
- 6. The various forms of information systems including transaction processing, management, and expert systems.
- 8. The SDLC phase that involves purchasing and installing new hardware and software, integrating the various system components, and testing the operation of the new system.
- 10. The SDLC phase that involves reviewing the system requirements document from the analysis phase and producing detailed specifications that cover all aspects of the system.
- 13. An activity that involves integrating various computing systems and software applications to function together as a whole.
- 14. A methodology or framework that defines steps and tasks for developing and maintaining information systems.
- 15. combination of technology, people, and procedures used to organize, analyze, and store data.
- 16. The SDLC phase that involves monitoring and evaluating the new information system.
Down
- 1. A systematic process for determining and addressing needs, or "gaps" between current conditions, and desired conditions or "wants".
- 3. A project management process that divides a large or complex project into smaller, more manageable projects that can be completed as part of an incremental or iterative process.
- 4. The SDLC phase that involves studying existing information systems that are already in place and the requirements for new information systems.
- 7. The study and design of a system by examining its components and their interactions.
- 9. A development model that breaks down project activities into a series of sequential or linear phases, each phase depending on the deliverables from the previous phase.
- 11. The practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time.
- 12. A development model that involves designing, implementing, and testing smaller pieces of the overall project, then cycling back and doing more analysis and design.