Across
  1. 8. submitted proposal to take on a construction project
  2. 9. Everything needed to complete a project
  3. 11. written document by an owner to the contractor looking for details about a certain product or activity
  4. 13. Company’s projected cost that is presented to the owner of a construction project
  5. 15. When an owner accepts the work as done and makes their final payments
  6. 16. time it takes for a single activity to be completed; usually measured in work days
  7. 17. when an activity has extra time to be started or finished then is planned for in the schedule
  8. 19. amount of working days specified in which the project is going to be completed
  9. 22. activity whose start time is reliant on completion of previous activities
  10. 23. the earliest time an activity can finish within a schedule
  11. 24. Item listed in a schedule with a start and end time
  12. 26. timelines and other symbols are used to denote different activities
  13. 28. how long a product takes from when it is order to when it is delivered
  14. 29. Outline of all project activities with lengths of all activities; also includes lead times
  15. 30. document allowing construction to begin on a project or specific part of a project
Down
  1. 1. a positive or negative incentive for early or late completion of a contract
  2. 2. alteration to the original contract that changes the amount, time, or requirements.
  3. 3. Activity point with no duration that measures current progress of a project
  4. 4. activities that need to be completed in allotted time for a project to be finished on time
  5. 5. after the design phase is finished, where you decide if a project should be constructed
  6. 6. hired by a contractor to complete specialty work on a project
  7. 7. extra allotted money for unforeseen expenses and changes to a project
  8. 10. how long it takes for concrete to finish drying
  9. 12. project where both construction and design are both done by one party
  10. 14. The latest an activity can finish to keep the project on time
  11. 18. the latest an activity can start to keep the project on time
  12. 20. Document from buyer to seller to obtain material, services equipment or supplies
  13. 21. restrictions on a site that allows only certain types of buildings to be construction
  14. 25. the earliest time an activity can start within a schedule
  15. 27. rules of professionalism that one adheres to when part of an organization