  1. 6. If you want to see the steam generators, you’ll have to go inside ____________.
  2. 9. C2R26 is scheduled for _________-______ days.
  3. 11. Always maintain a ______________ attitude.
  4. 12. TEAM Attributes:Thinking, ___________, aligned and motivated.
Down
  1. 1. C2R26 has a ____________ day bulk work window.
  2. 2. ________________ operates the plant.
  3. 3. Outage Slogan: You are a __________ of our success.
  4. 4. _______________ is the string of work that drives the outage.
  5. 5. The outage start date has been moved up to March ____________.
  6. 7. We have_______ refueling outages in 2024.
  7. 8. We must perform our work ___________ and with quality.
  8. 10. We typically have ____________ months between outages.