Chapter 11: Design Coordination

123456789101112131415
Across
  1. 3. Request for Information submitted by the contractor
  2. 6. A system used for managing multiple projects
  3. 8. The biggest problem in design project management
  4. 9. This is one element that should be reviewed during the design process
  5. 10. A ________ bar chart is one way to display a project's design cost
  6. 11. Chapter 11 covered material on Design __________
  7. 12. Considering this factor leads to lower costs, better productivity, and earlier project completion
  8. 14. AKA "objective matrix"
  9. 15. One of the four main components in the design evaluation matrix
Down
  1. 1. What the design cost is measured in
  2. 2. The types of indexes included in the contract documents are Drawing, Equipment, and _____ Indexes
  3. 4. The third method listed for the design evaluation matrix criteria
  4. 5. Excessive ________ use is a primary source of errors in the contract documents
  5. 7. Relates to changes that alter the project's original scope
  6. 11. Type of attitude someone should have when participating on multiple small projects
  7. 13. _______ documents are produced by a design frim and include comprehensive material necessary to construct a project