complete_rmt_22
Across
- 3. The role responsible for maintaining product roadmap
- 4. The abbreviation for Innovation management.
- 6. The meaning of RTE
- 9. Creator of the Software Design plan
- 10. The process of setting up an information pool, market segmentation, market sizing, customer analysis, competitor analysis, trend & technology analysis, internal analysis.
- 11. The experience distilled from a project that should be actively taken into account in future projects in the context of KM.
- 16. Role responsible for qualification of software
- 19. Abbreviation for product management process
- 20. Abbreviation for Scaled Agile Framenwork
- 22. The time needed from creation of the problem to the resolution of the problem, i.e. rejection or the implementation and acceptance of a change.(2 words)
- 25. Cybersecurity work result that gives a conclusive statement about the status of the cybersecurity-related quotation, concept, implementation, verification and validation activities within a project.
- 28. Software Requirements Analysis process in ASPICE
- 29. The meaning of swc
- 30. Short name for workshops where a team reflects the way it works and identifies potentials for improvement.(plural)
- 31. Abbreviation of Software Detailed Designs
- 35. Abbreviation used for Cybersecurity Engineering process.
- 36. Standard for road vehicles functional safety
- 38. The prerequisite identified as necessary for a user, or a user group, to achieve a goal, within a specific context of use.
- 41. Object oriented programming language lunched in 1995
- 43. The abbreviation of Automotive Software Performance Improvement and Capability dEtermination
- 44. The abbreviation of the business development process.
- 45. The international standard for the automotive industry, addressing cybersecurity risks within modern road vehicles.
- 46. The document that defines the safety strategy in the project
- 47. The IEEE-STD-610 defines it as “An activity that ensures that an end product stakeholder’s true needs and expectations are met.”
- 50. The abbreviation for the work result "Software Quality Assurance Plan", defined by IEEE 730.
- 52. Record of the an exact result of a performed integration step.
- 53. Abbreviation for a requirement management plan
- 56. Role responsible for identification and analysis of market-specific trends & technologies.
- 59. The inspection of selected processes in selected instances (projects, products, locations, …) and that identifies weaknesses in terms of compliance and risk
- 63. The highest-level backlog in SAFe
- 64. The process of identifying (current and future) business critical knowledge areas as well as capturing, developing, sharing, and effectively using organizational knowledge.
- 67. The coordinator that helps the program achieve the program goals.
- 68. Attribute of a change request derived from risk, impact, affected customers, upcoming release schedules, etc.
- 69. The workresult work result defining the pricing in line with the market, in responsibility of the business development manager.
- 70. Any potential failure identified in internal reviews, testing, etc.
- 71. The infrastructure used by the project defined in the configuration management plan.
- 72. Problem resolution management process in ASPICE
- 73. Type of testing performed to expose defects in the interfaces and in the interactions between integrated components or systems.
- 76. The task that tracks the program progress against the program goals and to identify potential deviations in time.
- 77. Role responsible to create the cybersecurity concept.
Down
- 1. Work result with the purpose to provide basic information about the expected outcome of the incubator project.
- 2. Important event in the history or development of something or someone
- 5. Abbreviation of Software integration and integration test process.
- 7. An individual or organization having a right, share, claim, or interest in a system or in its possession of characteristics that meet their needs and expectations. (ISO12207)
- 8. The abbreviation for the features and high-level requirements
- 9. Software integration and integration test process in ASPICE.
- 12. The set of five criteria that a product name must fulfill in order to become a product brand.
- 13. Abbreviation of User Experience Engineering process.
- 14. Work result that is treated as a single entity in the configuration management process.
- 15. The abbreviation of system test process
- 17. Role responsible for evaluating the received new product ideas and giving feedback to the Employee (accept for further development, or reject).
- 18. Task in portfolio management with the purpose to mitigate risks of double work in research and development and to use the scarce resources optimally.
- 20. A software component, that contains one or more software components (units and/or other compositions)that makes hierarchical structures in the architectural design possible.
- 21. A series of actions taken in order to achieve a certain result
- 23. The abbreviation of software test process
- 24. The role responsible to drive new business ideas, identify its business potential, and create new business models
- 26. Standard used as reference for defining the User Experience Engineering process
- 27. The abbreviation used for Problem Resolution Management process
- 32. Work results that triggers the change management activities according to the change request management plan
- 33. The name of the qualified set of frozen configuration items is
- 34. The process established to maintain the integrity of all work results of a process or project and make them available to parties concerned.
- 37. Role with skills that is independent of the project and performs process audits and assessments.
- 39. Role responsible for deciding whether a change is to be applied.
- 40. Smallest piece of software
- 42. The strategy that provides the work result is to provide guidance for innovation activities in the next 5 years.
- 48. The IEEE-STD-610 defines it as “A test of a system to prove that it meets all its specified requirements at a particular stage of its development.”
- 49. Abbreviation of program management process
- 51. A cross-functional group of 5-11 individuals who define, build, test, and deliver an increment of value in a short time box.
- 54. Role responsible to plan, measure, act on and report the project.
- 55. The abbreviation of Portfolio management process
- 57. Implemented by planned activities, or divided into sub-goals
- 58. The ordered list of features or enablers on a high level (e.g. epics), part of a program.
- 60. A collection of projects which are connected by joint goals to obtain benefits not available from managing the projects individually.
- 61. Abbreviation of Software Architectural Design
- 62. Prioritization of software units to provide the information what is to be done in which order
- 65. The fictitious yet realistic representations of users of a system, including details like their mental models, limitations in cognition or physical mobility.
- 66. The list of the available product lines, products and product items with the corresponding license types and prices.
- 72. The abbreviation for the work result "software project management plan", which is also defined by IEEE 1058
- 74. Abbreviation for Subject Matter Expert.
- 75. Abbreviation used for change request management process