Construction 102
Across
- 3. (Clue: Material covering the top of the building)
- 4. (Clue: Front exterior of the building)
- 7. (Clue: The outdoor surroundings of the building)
- 12. (Clue: Material to regulate temperature)
- 13. (Clue: A set of steps connecting levels)
- 16. (Clue: The process of improving and updating)
- 17. Dock (Clue: Area for receiving and shipping goods)
- 18. (Clue: A material used for wall finishing)
- 19. (Clue: A legally binding agreement)
- 20. (Clue: System of pipes for water and sewage)
Down
- 1. (Clue: The process of providing fresh air)
- 2. (Clue: Dining area within the store)
- 5. (Clue: Vertical transport device between floors)
- 6. (Clue: A roof-like structure for shade)
- 8. (Clue: Structural skeleton of the building)
- 9. (Clue: Architect's detailed plans for construction)
- 10. (Clue: Facility for personal hygiene)
- 11. (Clue: Official authorization for construction work)
- 14. (Clue: Architect's detailed plans for construction)
- 15. (Clue: Covering surfaces with ceramic or stone)