Road Work Ahead

12345678910111213141516171819
Across
  1. 3. WHERE HAROLD AND KUMAR WENT
  2. 4. 3.1415
  3. 7. THE LEGAL PRINCIPLE THAT WHEN A CONTRACTOR FOLLOWS THE PLANS/SPECS FURNISHED BY THE OWNER, THE CONTRACTOR IS NOT LIABLE TO THE OWNER FOR ANY LOSS OR DAMAGE RESULTING FROM THE DEFECTIVE PLANS/SPECS.
  4. 8. __________ REVIEW IS THE TESTING OF UNPROCESSED, UNCRUSHED SAMPLES FROM AN AGGREGATE SOURCE FOR THE PURPOSE OF EVALUATING THE SOURCE BEFORE IT IS PROCESSED.
  5. 9. PROTECTS EMPLOYMENT RIGHTS AND SETS MINIMUM WAGES FOR WORKERS ON GOVERNMENT FUNDED PROJECTS, FOR SHORT.
  6. 10. IN 2016, IT WAS ESTIMATED THAT OVER THE FOLLOWING 15 YEARS, THE STATE OF OREGON WOULD SPEND $1.6 BILLION ON ________
  7. 11. A PIPE FITTING THAT CHANGES DIRECTION OF THE PIPE
  8. 13. NUMBER OF ODOT REGIONS IN OREGON.
  9. 14. THERE ARE ________ MILLION BRICKS IN THE EMPIRE STATE BUILDING.
  10. 16. “WINNERS AREN'T LOSERS” IS A CHILDRENS BOOK WRITTEN BY THIS PRESIDENT.
  11. 17. A LIST OF ODOT APPROVED PRODUCTS, FOR SHORT.
  12. 18. STATE THAT SPENDS THE MOST ON INFRASTRUCTURE.
  13. 19. ANOTHER NAME FOR CONCRETE
Down
  1. 1. WHAT THE AVERAGE AGE OF A CONSTRUCTION WORKER IS DOING
  2. 2. PER THE FTMAG, _______ _______ GRADE CONCRETE REQUIRES TESTING EVERY POUR, EVEN IF IT’S LESS THAN 20 CY.
  3. 4. ORS 279C.570 ________ ________ POLICY STATES, AMONG OTHER THINGS, THAT IF THE OWNER PAYS LATE, INTEREST SHALL AUTOMATICALLY BE PAID WITHOUT CONTRACTOR REQUEST.
  4. 5. ADDITIONAL TESTING IS REQUIRED FOR ROCK THAT WILL BE USED TO BACKFILL THESE TYPE OF WALLS, ONE OF WHICH IS ELECTRICAL RESISTIVITY (ACRONYM).
  5. 6. WHERE YOU FIND TESTING FREQUENCIES, FOR SHORT
  6. 10. 3000 PSI CONCRETE
  7. 12. JANE WAS PAID FOR 10 HOURS. HOW MANY DID SHE ACTUALLY WORK?
  8. 15. PERSONEL PROTECTIVE EQUIPMENT