Crossword Puzzle for Must-Know Lessons Learned
Across
- 2. The introduction of __________________ into plant systems can result in unanalyzed conditions that potentially affect the ability of systems to perform their intended functions.
- 5. Abnormal plant conditions, or indications that cannot be readily explained need to be identified and __________________.
- 6. Ensure that breaker and motor control center cabinet ventilation is __________________, or conduct monitoring during high ambient temperature periods to ensure that internal components do not overheat above manufacturer's recommendations.
- 7. Ensure the circuit breaker preventive maintenance program considers __________________ recommendations and station and industry operating experience and is applied to appropriate breakers.
- 9. Take actions in the following areas to preclude failures of large transformers and support components: performance monitoring and trending, life cycle management, design and manufacturing considerations, operating procedures, __________________ roles and responsibilities for associated work groups, hazard analysis, and training for site and supplemental personnel who maintain or operate transformers and related components.
- 11. Potential causes of gas intrusion include fill and vent evolutions, maintenance or operational activities, pressure transients while near gas __________________, and plant design.
- 13. Review the __________________ processes used to implement changes to emergency power systems periodically to ensure that thorough modification controls are applied.
- 14. Periodically inspect the electrical distribution system, including the main generator, bus ducts, transformers, high voltage switchgear, ground detection system, medium voltage cables, and __________________ systems such as space heaters and thermostats exposed to extreme weather conditions.
- 15. Investigation into causes of abnormal plant conditions must be __________________ to confirm there is no adverse condition that could impact safety or reliability.
- 17. Review performance monitoring practices for emergency power systems periodically to ensure current __________________ identify degrading component performance.
Down
- 1. Consequences from gas accumulation include inoperable systems; water __________________; pump trips, high pump vibration, and pump damage; abnormal system flow; and inaccurate level indication.
- 3. When purchasing replacement components for electrical distribution system, specify cabinet __________________ temperature (not room temperature) and expected voltage and current surges during transient conditions.
- 4. Review existing emergency power system component degradation and design __________________ periodically for common cause and common mode failure.
- 8. Establish clear acceptance criteria, as well as actions required upon exceeding these acceptance criteria, for the __________________ monitored.
- 10. __________________ performing this review should identify and use applicable industry best practices for comparison to current performance monitoring practices at their plants.
- 12. The potential effects of these abnormal conditions must be considered in the __________________ as well as individually.
- 16. Equip large power transformers with on-line discriminating gas-in-oil analyzers. System engineers should periodically monitor and __________________ the results.