Across
- 3. - hydraulic operation
- 7. - done once in 6 months
- 9. - I am located at a distance of 30m within the battery limit (7)
- 10. - Level 1 scenario (10)
- 13. - incharge for level 3 scenario
- 14. - Used in cable cellar protection
- 15. - fire water demand to be designed as per OISD
- 17. - done once in 6 months
- 19. - best for contained LNG protection
- 21. - Incharge of the Emergency Response (3)
- 23. - for High FP flammable liquids - Above 65 Degree Celsius
- 24. - will be done for positioning the detectors(12)
- 26. - increasing temperature detectors
Down
- 1. - Agency responsible for certifying the ERDMP
- 2. - Detector type used to cover longer distances (8)
- 4. - detectors installed in battery room
- 5. - required for all the pumps
- 6. - For quick detection (5)
- 8. - fire proofing
- 11. - all 3 resulting in fire
- 12. - to be done after 5 years
- 16. - for cooling the surface
- 18. - to be located near loop junctions
- 20. - Will be placed in field and activated manually (3)
- 22. - used in PAGA for indication
- 25. - fifi system required in jetty as per OISD 156