Across
- 3. The government agency responsible for regulating energy matters in Uganda
- 5. The process of converting crude oil into various usable products
- 6. The type of equipment used to control the flow of oil at different points along the pipeline
- 8. The term for the external layer of the pipeline that protects against environmental elements
- 9. The organization overseeing the environmental and social aspects of the EACOP project
- 12. Installation The phase that involves constructing the physical pipeline infrastructure
- 13. Pumping The method used to transport oil in the absence of external power
- 16. The process of restoring the environment after construction is complete
- 17. The process of verifying the quality and purity of crude oil
- 19. The government agency responsible for land matters in Uganda
- 20. The phase that involves the removal of impurities from crude oil
Down
- 1. The phase involving the removal of trees and vegetation from the pipeline's path
- 2. Study The term for the initial phase of the EACOP project where feasibility is assessed
- 4. The component that ensures a smooth transition between sections of the pipeline
- 7. The system used to regulate the flow of oil through the pipeline
- 10. Pipes The material used to create the physical pipeline
- 11. The government agency responsible for environmental matters in Tanzania
- 12. The system used to protect against over-pressurization in the pipeline
- 14. The stage where the pipeline is inspected and tested for safety and functionality
- 15. The organization responsible for ensuring safe and efficient transportation of oil
- 18. The process of laying out the pipeline's route and marking it on the ground