ENGINEERS WEEK 2026
Across
- 6. — Field team setting stakes/collecting data (13)
- 10. — Clean, as a CAD layer (4)
- 14. — Vertical transport in buildings (8)
- 15. — Second half of the 2026 slogan (10)
- 16. — Sighting marks in a level scope (6)
- 18. — What holds a presentation board (5)
- 19. — Roadway drainage structure (7)
- 22. — Track element (4)
- 23. — What you drive to mark lines (6)
- 24. — Accessibility law initials (3)
- 26. — Stabilizer for clay soils (4)
- 28. — Move water away (5)
- 29. — Keep (6)
- 32. — Lake‑related (as in wetlands) (10)
- 35. — Rock slope protection (6)
- 36. — Spatial info set (7)
- 38. — Roof edge (4)
- 40. — Medium you compact (4)
- 42. — Solid‑waste facility (8)
- 45. — Document showing right‑of‑way (6)
- 46. — Paving material (7)
- 47. — Make flat (5)
- 49. — “Estimated time of” departure (abbr.) (3)
- 50. — PPE and tools, collectively (4)
- 52. — What a P.E. applies to plans (4)
- 54. — And the rest (abbr.) (3)
- 55. — Flow unit for stormwater calcs (abbr.) (3)
- 56. — Triangulated frame (5)
- 58. — Transportation dept. (abbr.) (3)
- 59. — Single plan page (5)
- 60. — Licensure for engineers (abbr.) (2)
- 61. — Erosion-control tube (6)
- 63. — What silt fence combats (7)
- 64. — Efficient lighting type (3)
- 65. — Pressure unit (abbr.) (3)
- 66. — Pavement border (4)
- 67. — Village near Madison (6)
- 68. — River segment (5)
- 69. — Travel way in a roadway cross-section (4)
- 71. — On‑site team (4)
- 72. — Span over water or roadway (6)
- 74. — Discipline for loads and frames (21)
Down
- 1. — Bring into line (5)
- 2. — Instrument in scanning/levels (5)
- 3. — The firm (15)
- 4. - What you do before you build (4)
- 5. — Old-school survey scope (7)
- 6. — Measure land (6)
- 7. — Adhesive for anchors (5)
- 8. — Detail added to a plan sheet (5)
- 9. — What you move in grading (5)
- 11. — Village where Jewell began (11)
- 12. — What designs must meet (4)
- 13. — Where runoff is conveyed (10)
- 17. — Kind of imagery used in GIS (6)
- 20. — Change fundamentally (9)
- 21. — Designing for runoff quantity/quality (21)
- 25. — Mapmaking tech for assets (abbr.) (3)
- 27. — Drawing note for height (abbr.) (4)
- 30. — Reduce friction or slope (4)
- 31. — Proposed vertical profile (9)
- 33. — Northwest Wisconsin city with Jewell presence (9)
- 34. — State for Spring Green & Madison (abbr.) (2)
- 35. — ADA element for grade change (4)
- 37. — Raise (7)
- 39. — Recorded right for access/utilities (8)
- 41. - Annual celebration of the profession (13)
- 43. — Service for acquiring project parcels (21)
- 44. — Discipline designing buildings and spaces (12)
- 48. — Curve measure (6)
- 51. — Public right‑of‑way (3)
- 53. — Set the slope (5)
- 57. — Plaster backing strip (4)
- 59. — Pro measuring boundaries (8)
- 62. — Joint filler (7)
- 65. — Saw cut (4)
- 70. — Concrete reinforcement (5)
- 73. — What contractors submit (3)