HS2 Cryptic Crossword
Across
- 4. Building for the future without depleting resources
- 8. Word dreaded by rail enthusiasts
- 11. Tilt of the railway track on curves
- 12. Starting point for many HS2 debates
- 13. The route — both political and physical
- 16. Earth moved during tunnelling — not the ending of a movie
- 17. How you dig tunnels — and how the delays feel
- 18. What keeps the line grounded — literally
- 20. Type of electric line powering high-speed trains
- 22. Street name with a new station in Birmingham
- 23. Hills that made HS2 dig deep
- 24. The process of awarding construction contracts
- 26. Town once considered for HS2 stops
- 29. Distance between the two rails
- 30. Relating to the impact of construction on nature and communities
- 31. Economic revitalisation around HS2 stations
Down
- 1. What happened to HS2’s northern leg in 2023
- 2. Key reason for project delays or cuts
- 3. Rails laid for trains to run on
- 5. County with long stretches of HS2 tunnelling
- 6. Tall steel tower carrying overhead power lines
- 7. Profession designing and constructing HS2
- 9. City at the heart of HS2’s first phase
- 10. Action to reduce negative effects — especially on wildlife or heritage
- 12. The problem-solver behind every viaduct
- 14. Major factor leading to HS2 “reset”
- 15. Bridge structure allowing HS2 to cross valleys and rivers
- 19. Southern starting point of the HS2 route
- 21. Ensuring HS2 connects with other rail networks
- 25. Company responsible for parts of the build
- 27. When the government hits “Ctrl+Alt+Del” on HS2
- 28. Structure projecting horizontally, key in bridge design