HSE Crossword
Across
- 4. Scheduled waste generated can be stored on site for a maximum period of ______ months
- 5. During the pre-construction phase, the client must ensure that a ________ risk assessment has been completed.
- 6. One of the client’s key duties under the Construction Work and Design Management (CWDM) regulations is to appoint a PCW _____ before the construction phase begins.
- 9. Under Regulation 8, the client is responsible to ______ the Department of Occupational Safety and Health (DOSH) about the construction project.
- 10. Any incident that occurs on site must be reported to the Project HSE Department and management within ________hour.
- 11. Under Regulation 7 of the Environmental Quality Act(EQA)1974, the highest fine that can be imposed for a serious offence is up to ______ ringgit.
- 12. Erosion and sedimentation control structure used to slow down and spread stormwater runoff.
- 14. Material used to stabilize slope or drain to reduce erosion
- 15. The contractor must provide, maintain, and implement an _________ response procedure throughout the duration of the project.
Down
- 1. In addition to the fine on question 11 , the offence may also carry _______ imprisonment as part of the penalty.
- 2. The client must also appoint a Principal Construction Work ______ to ensure design-related safety responsibilities are fulfilled.
- 3. One of the arising safety concern in workplace which do not arise from physical substance is ______ hazard.
- 7. According to the Guidelines on Prevention Principles (GPP) under the Occupational Safety and Health Construction Work Design and Management, all parties should prioritize the _________ of risks before applying other operational controls.
- 8. The maximum financial penalty that can be imposed on a client for non-compliance is ________hundred thousand.
- 13. One of the duties of the Principal Construction Work Designer (PCWD) is to prepare a safety and health ______for the project.