IPT Year 12 Project Management
Across
- 5. Funding management plan - Determine how much (blank) is available and how it will be spent (5)
- 7. A method of conversion done step by step and feature by feature (6)
- 8. A disadvantage of a team, due to failure to communicate (12)
- 10. A (blank) report includes five stages(12)
- 12. (Blank) listeners encourage the speaker and are noncommittal (6)
- 13. When a team functions well, there are multiple (blank) (10)
- 15. Used to determine when each task will be done and by whom (4)(10)
- 19. The aim of an (blank) is the collection of information to inform the system development (9)
- 20. A project management tool used for time scheduling (5)(5)
Down
- 1. The process of getting a group of people working together (4)(8)
- 2. A system development approach (11)
- 3. Shows the organisational structure of a database (6)
- 4. The role which decides whether a new or updated system will solve the problem (7)(7)
- 6. Level 0 DFD (7)(7)
- 9. The role which develops schedules, checks work and resolves conflicts (6)(6)
- 11. A (blank) study assesses the technical, economic and operational factors(11)
- 14. An array of questions that are used to gather data (7)
- 16. Represents systems by showing various interfaces present in a system as well as the links between them (5)(5)
- 17. (Blank) and ethical issues should be considered in project management (6)
- 18. A diagram used to display an information system as a number of processes (3)