IST work
Across
- 2. brief A design brief is a project management document outlining the specifics of a design project.
- 3. map Concept maps are visual representations of information.
- 5. is cost-benefit analysis? A cost-benefit analysis is the process of comparing the projected or estimated costs and benefits (or opportunities) associated with a project decision to determine whether it makes sense from a business perspective.
- 9. protocols A protocol is a set of step-by-step guidelines
- 10. the action of working with someone to produce something.
- 12. a way of carrying out a particular task, especially the execution or performance of an artistic work or a scientific procedure.
- 14. factors ethics are principles, codes of conduct and values that govern fundamental behaviors of humans
- 15. study an assessment of the practicality of a proposed plan or method.
- 17. criteria Evaluation Criteria are the standards by which accomplishments of required technical and operational effectiveness and/or suitability characteristics or the resolution of operational issues may be assessed
- 18. of solution Functional requirements define the specific behaviors, responses, information, rules, or operations of a solution.
Down
- 1. a limitation or restriction.
- 4. facilitator A facilitator plans, guides and manages a group event to meet its goals.
- 6. factors It is a score card on the financial performance of your business that reflects when sales are made and when expenses are incurred
- 7. group discussion to produce ideas or solve problems.
- 8. dynamics the study or use of the processes involved when people in a group interact.
- 9. work work done by a group of people in collaboration.
- 10. the imparting or exchanging of information by speaking, writing, or using some other medium.
- 11. benefit analysis
- 13. path the sequence of stages determining the minimum time needed for an operation, especially when analysed on a computer for a large organization.
- 16. chart a chart in which a series of horizontal lines shows the amount of work done or production completed in certain periods of time in relation to the amount planned for those periods.