KAIZEN™ & Opex Challenge

123456789101112
Across
  1. 1. "P" stands for in "PDCA" Cycle
  2. 3. A Japanese word meaning “horizontal deployment” and refers to the practice of applying good results of KAIZEN™ in one area to other areas.
  3. 6. The Japanese word for “Big room”, also known as Mission Control Room
  4. 7. A visual card or Visual Signal
  5. 8. A Japanese term for the place in an organisation where work is being performed, emphasized in KAIZEN™?
  6. 10. Automation with human touch
  7. 12. A person who manages all the logistical work of bringing components, raw materials, etc., in small quantities to workstations
Down
  1. 1. What does the "P" stand for in the term "SIPOC"?
  2. 2. A real-time visual indicator in a line that is triggered by the Operator to bring attention to an emergent problem
  3. 4. A Japanese word for Waste and a key concept in the TPS
  4. 5. ___ means routine or pattern of behavior.
  5. 7. A visual control to perform audits to processes. The result of the verification is visually displayed (green/red).
  6. 9. The concept of Benchmarking is based on the Japanese Word, meaning Best of the Best.
  7. 11. Poka-yoke prevents