Kanban Terms

123456789101112
Across
  1. 2. A process where the Kanban Method is being applied, but which does not yet show characteristics of a mature system; for example without WIP Limits.
  2. 7. The ratio of the time spent working on an item (Touch Time) to the total Time in Process
  3. 9. The time it takes for a work item to move from the commitment point to the delivery point
  4. 10. A visual display of the cards in a system
  5. 11. The number of work items exiting a system or sub- system per unit of time
Down
  1. 1. The point in a kanban system at which the commitment is made to deliver a work item
  2. 3. The point at which an item is considered to be delivered or complete
  3. 4. A chart showing the cumulative number of arrivals and departures from a process, or parts of a process, over a time period (Abreviation)
  4. 5. The act of populating the input queue for a service.
  5. 6. A policy that constrains the amount of WiP allowed in a given part of the system
  6. 8. A method for defining, managing, and improving services that deliver knowledge work
  7. 12. The sum of all the times during which a work item is actively being worked on excluding wait times