Lean CLE 6 Value stream
Across
- 2. time between two process steps
- 5. Future state of process is called
- 7. bridge between CSVSM and FSVSM is by creating _______
- 11. strain
- 12. the lower half of the VSM maps_______ flow
- 13. seven wastes
- 14. state of the process with zero NVA is called
- 16. ______the process is the Preferred method to capture VSM.
- 17. cycle time is considered as __by customer (acronym)
- 18. define ________of process before starting VSM
Down
- 1. waiting for approval is example of ____ activity as per lean
- 3. the upper part of VSM maps _____ flow
- 4. Current state of process is called
- 6. variation
- 8. ___________perspective required to map Current state VSM.
- 9. ______based is the least Preferred method to capture VSM.
- 10. eight waste is related to
- 11. waste is called as ______in Toyota.
- 15. time from start to end of the process