LOTO (Lockout/Tagout)

1234567891011121314151617181920
Across
  1. 4. Test for ________ after isolation was completed.
  2. 5. _______ employees must be notified before equipment shutdown for repair.
  3. 7. ________ for shutdown is the first step of the procedure.
  4. 8. Lockout tagout must be performed before _______ are removed.
  5. 10. A warning __________ with your details is placed on equipment to indicate it is under maintenance
  6. 12. Energy that can cause a shock and possibly kill someone
  7. 15. The physical securing of energy-isolating devices to prevent operation
  8. 17. Energy from moving parts of a machine
  9. 19. Shutting off a breaker is an example of _________ equipment.
Down
  1. 1. Lockout and tagout must be performed before performing ___________.
  2. 2. A colour of safety guards, used for protecting moving parts of a machine
  3. 3. Bleeding off air is an example of _________ stored energy.
  4. 6. _____________ energy is air under pressure.
  5. 9. Many machines have stored _______ that must be isolated or released before it is safe to repair them.
  6. 11. ______________ energy is fluid under pressure.
  7. 13. Every person must have their own __________ to isolate equipment or machines being worked on
  8. 14. The key to isolating and reenergizing equipment or machines being worked on is positive and continuous ___________
  9. 16. Equipment should be turned ___ with the start/stop button.
  10. 18. A device used to allow an energy source to be isolated by more than one worker
  11. 20. The abbreviation for Lockout/Tagout