LPT CROSSWORDS / HARC STANDARD

123456789101112131415
Across
  1. 3. Maximum period of time that a HARC can be valid without being reviewed.
  2. 4. Type of portable HARC that can be used as a guide for hazard analysis and risk control.
  3. 5. Process done when deviating from a Standard. It also requires a HARC to be done.
  4. 6. The risk level after risk control measures.
  5. 9. Residual risk zone that requires the job to be stopped until further risk reduction.
  6. 11. Tool used to quantify the Risk Level based on likelihood and severity.
  7. 12. One of the ideal risk levels to what the risk should be reduced after a HARC.
  8. 13. Something that has the potential to cause an accident.
  9. 14. As Low as Reasonably Practicable.
Down
  1. 1. System to which a HARC should be uploaded when approved.
  2. 2. Hazard Analysis and Risk Control.
  3. 4. Actions for reducing the likelihood of an incident occurring.
  4. 7. The risk level prior to risk control measures.
  5. 8. Color that represents extreme risk.
  6. 10. Actions for reducing the severity of an incident.
  7. 15. What comes from combining an activity with the presence hazards.