Lyme Regis - coastal management scheme

1234567891011121314151617
Across
  1. 7. (HARD ENGINEERING) sea walls at lyme regis are 390m wide and __ metres high.
  2. 8. (HARD ENGINEERING) rock armour is used in one area to extend the h__ a__, and in one area to protect the sea wall.
  3. 12. (MANAGEMENT) The name of the management strategy for Lyme Regis is the Lyme Regis e__ i__ scheme
  4. 14. (HARD ENGINEERING) rock armour helps to break up storm wave energy and protect existing __.
  5. 15. (MANAGEMENT) management is required to combat coastal erosion and protect the town from unstable l__
  6. 16. (HARD ENGINEERING) rock armour is relatively __ and doesn’t require maintenance.
  7. 17. (SOFT ENGINEERING) d__ is used in the process of beach nourishment where a big boat scoops, sifts and collects sand and shingle from the harbour every year to improve navigation and as the sand replenishes the beach.
Down
  1. 1. (SOFT ENGINEERING) beaches at lyme regis are bigger and healthier from __ __
  2. 2. (COSTS) some people feel that the new defences spoil the n__ l__
  3. 3. (BENEFITS) the v__ number has increased.
  4. 4. (COSTS) more visitors means more l__
  5. 5. (MANAGEMENT) the environmental improvement scheme at Lyme Regis costs approximately £__ million.
  6. 6. (BENEFITS) the h__ is protected
  7. 9. (BENEFITS) The defences ARE __ the coastline.
  8. 10. (COSTS) more visitors increase traffic __
  9. 11. (SOFT ENGINEERING) beach replenishment is effective as wide sandy and shingle beaches absorb __ __ already.
  10. 13. (HARD ENGINEERING) £__.__ million was spent on a new sea wall relatively recently