MIS 121 Exam
Across
- 4. A document provided to vendors to ask them to propose hardware and software products or services that will meet the requirements of a new information system.
- 6. RAD: _______ Application Development
- 8. The extent to which a system/subsystem performs a single function.
- 9. Divides a system and it's
- 10. Is represented by a rounded rectangle in a DFD
- 11. Limit to what a system can accomp lish (plural).
- 12. Costs that cannot be easily measured with a monetary value.
- 15. Everything external to a system that it interacts with
- 16. abbreviate the 5 phases of SDLC in order; _____ Point
- 17. Process _______: The activity of graphically representing processes in a system, to show, processes that capture, manipulate, store and distribute data between a system and its environment and among system components.
- 19. The Ateneo follows the ________ model of education
- 20. the second phase of the SDLC
Down
- 1. ________ software: non-customizable software
- 2. A "contract" between the IS staff and the customer regarding deliverables and time estimates for a system development project.
- 3. A system that is used to enable more participation in JAD sessions
- 5. Turning over responsibility of some or all of an organization's information systems applications and operations to an outside firm.
- 7. The process of going from Context Level to Level – 0
- 13. Alternative to waterfall; like a cat.
- 14. There must be conservation of inputs and outputs to a data flow process when that process is decomposed; also happens in accounting
- 18. Systems Analysis and ________