Newsletter
Across
- 3. Takes place after a new well is drilled and completed, after workover or after well stimulation
- 6. _______ line requires a second control line entering the SCSSV below the operating piston which creates hydrostatic balance on the piston
- 7. A Committee that have jointly produced guideline to standardize and optimize a complete end-to-end completion cycle
- 10. Some of the features of ____ are variable orifice size at any depth, deeper injection and automated gas lift production
- 11. Installation of horizontal subsea tree on rig crane eliminates equipment preparation at _________
- 12. ______ valve eliminates intervention job during EWT phase and eliminate tool retrieve time for reset cycle open/close
- 14. First interventionless downhole barrier valve installation in PETRONAS and in Asia
- 15. System that enables isolation, stimulation and gravel packing of multiple zones in single trip using same workstring
Down
- 1. One of the solutions to the challenges faced by ____ Drilling Campaign was WHCP modification by installing back pressure regulator between WHCP and Exit Block
- 2. Pro-G connect is an augmented reality _________ technology that enables completion supervisors to assist NDSV offshore remotely
- 4. Two-dome shaped disks that is run on bottom of the tubing or below a packer BHA to isolate tubing to set hydraulic packers.
- 5. There is no health without _______ health
- 8. Derived to design the well right to streamline completion cost efficiency over reserves volume and well integrity
- 9. An alternative sand control system that utilizes Shape Memory Polymer technology
- 13. TR1P technology is a system that combines upper and lower completion with remote ______ activation technology