Offshore Execution Safety Month

12345678910111213
Across
  1. 1. Safe Working Load for lifting and rigging
  2. 3. Wind Turbine Installation Vessel for offshore construction
  3. 6. Man Overboard emergency recovery procedure
  4. 8. Point of Work Risk Assessment before starting
  5. 9. As Low As Reasonably Practicable risk management
  6. 10. Lost Time Injury incident classification
  7. 11. Engineering Procurement Construction and Installation phase
  8. 13. Hazard Identification and Risk Assessment process
Down
  1. 1. Service Operation Vessel for technician offshore stay
  2. 2. Lock Out Tag Out energy isolation procedure
  3. 4. Total Recordable Incident Rate performance metric
  4. 5. Global Wind Organisation safety training standard
  5. 7. Job Safety Analysis for identifying task hazards
  6. 8. Personal Protective Equipment required for site access
  7. 9. All Injury Frequency Rate safety reporting index
  8. 12. Crane Vessel used for heavy lift operations