Opus
Across
- 2. / Fixed Quantity models are ____ triggered.
- 3. Wiggly / In 1950 delegation from Toyota visited USA for TPS inspiration in this company
- 4. / Prohibiting product from being taken out of its fixture due to quality defects as a result of machine or operator action
- 7. / According to ACAT in risk management, C stands for:
- 8. / Forecasting model mostly suited for the data that has varying levels and trends with seasonality and long shelf life
Down
- 1. to promise / is a business function that provides a response to customer order enquiries, based on resource availability
- 4. / This Production system requires fixed system robot layout: ____ Layout
- 5. / Japanese term for creating flow and eliminating waste used in TPS (Toyota Production System) can be defined as "automation with a human touch
- 6. / Point at which ordering cost = holding cost.