Pak Energy 052024

1234567891011121314151617181920
Across
  1. 2. Which field do we place driver instructions in that pertain to the order?
  2. 6. When building split pickups and droppoffs what icon do we select?
  3. 8. What feature in Pak Energy is utilized to conduct research on tickets?
  4. 12. Which selection is chosen to add/remove drivers on current shift?
  5. 14. What feature on the driver tablet is to be utilized if Driver is having System issues?
  6. 15. What feature is utilized to confirm connectivity of driver on Pak Energy?
  7. 18. Who is responsible for updating/removing/re-assigning work at the end of shift?
  8. 19. What step must a ticket be at in order to "split/move" onto another driver?
  9. 20. What feature is utilized for modifying a driver's schedule?
Down
  1. 1. What are the two methods of creating a load?
  2. 3. What is the default number (3 x's back to back)entered for loaded mileage field if one is not auto populated or unknown?
  3. 4. What type of box populates when work is changed or message is sent on the driver's tablet?
  4. 5. Field 2 utilized for scheduled loads that specify quantity?
  5. 7. Which field does the customer reference number get placed?
  6. 9. Field 1 utilized for scheduled loads that specify the number of days?
  7. 10. What icon do you utilize in order to create a customization profile?
  8. 11. What must be selected when assigning loads from availability to driver?
  9. 13. What is the name of the feature you select when you right click on a drivers load for diversions?
  10. 16. What is the driver details feature used for?
  11. 17. A form of templated automation when building loads?