PARKING SYSTEM PUZZLE
Across
- 2. – Project with the maximum platforms.
- 6. –OUR FIRST DISPATCH IN THIS COUNTRY THIS YEAR.
- 7. – Our first project for Hiranandani.
- 10. LASER CUTTING MACHINE WAS FROM THIS VENDOR
- 11. – WHAT OUR PLATFORMS ARE MADE OF
- 13. – Factory’s responsibility before delivery.
- 14. – Final stage of every order.
Down
- 1. – Safety mechanism that prevents falls.
- 3. – Our first installation this year in Mumbai.
- 4. – The “Bible” of the order.
- 5. – Prepared by the client.
- 8. – Paid by the society for maintenance.
- 9. – The electrical brain of the system.
- 10. – Our first VPT project.
- 12. – Space needed for cars to maneuver.
- 14. – Interface used for operation.
- 15. – Used in back-to-back systems.