Permit To Work

12345678910111213
Across
  1. 4. What is the name of the situation where an EStop be used.
  2. 5. Where can conflicts of work easily be identified.
  3. 6. May cause contamination to product or product ingredients. ...... maintenance.
  4. 8. Only the Issuer(or Designate)and Receiver can install or remove these.
  5. 9. What is the name of the Certificate all Electricians need to provide of changes and additions of Electrical systems.
  6. 12. PTW system protects ............. from adverse affects. ( name one of the 4)
  7. 13. Should not be used for an isolation.
Down
  1. 1. Who has responsibility for ensuring that permit stations are kept stocked and tidy at all times.
  2. 2. What must be checked prior to permit authorisation with Isolations.
  3. 3. Not limited too inadvertent operation of equipment or process,sudden release of pressure,temperature,chemical substances are all sources of..........
  4. 4. Definition of the immediate surrounding and their constituent parts such as people,equiment,buildings,services,lighting,space,ventilation etc.
  5. 7. Where can operational hazards easily be identified.
  6. 10. Who is responsible for a Daily Audit.
  7. 11. How many levels of auditing are required for the PTW system.
  8. 12. Hazard Controls identified on a certificate must be included in the hazard controls of the ..........