PHX Work terminology

1234567891011121314
Across
  1. 3. These are used to trigger actions using senders and receivers
  2. 4. Generic name for containers used to transfer material within an MO
  3. 6. Generic name for containers used to keep stock of material eg. in a warehouse
  4. 7. Effective library elements can be used in an MBR as a copy or as ??
  5. 9. You should perform this BF before using any material in a MO
  6. 12. This is a range specified to compensate for the (in)accuracy of a weighing scale.
  7. 13. You perform this EQM BF when allocated equipment needs to be released
  8. 14. Container, scale, workroom, set-up parts are a type of ??
Down
  1. 1. If this time interval expires, the order HU cannot be used in the succeeding process steps
  2. 2. Outermost layer of MBR which can contain Basic functions inside it
  3. 5. Acronym for active material with potency
  4. 8. This represents the current equipment status
  5. 10. MBR in this life cycle stage can be used for production (eg. Draft/Inactive etc.)
  6. 11. Term used to say you will use all the material present inside an SU/HU