Power Drive L3

12345678910
Across
  1. 2. How long is the drilling cycle for PowerDrive Orbit?
  2. 5. What is the investigation methodology that we use during failure investigation either HSE or Quality-related incident?
  3. 6. What is the steering system that PowerDrive tool uses?
  4. 9. What is the time to have a verbal notification of 8 minimum facts for a catastrofic event?
  5. 10. What is the overall process of collecting and analyzing data to determine the cause of a failure and defining a mitigation plan?
Down
  1. 1. In the following example, if a PowerDrive failure generated a loss of 30 NPT hrs and $6,000K of red money; what is the severity of this event?
  2. 3. Which process aims to find the underlying reason/s of loss events in order to prevent recurrence of the event or similar events?
  3. 4. Is the process of sending steering commands to the tool by varying the mud flow rate or changing the CRPM?
  4. 7. Which is the operating phase where control unit tries to maintain steady and hold the desire tool face?
  5. 8. What does HIA stands for?