PQCT
Across
- 6. What is the primary purpose of the PQCT? minimize process variation, identify _____ ____, and outline corrective actions.
- 9. PQCT documents are saved on the NM Quality ___.
- 10. Which PQCT Table visually maps the sequential order of the process steps?
- 11. A/an _____ is required if changes are made to the PQCT in mass production.
- 12. (F) Fire, (S) No Stop, (R) No Run, (T) No Turn are examples of what?
Down
- 1. Control methods, reaction plans, critical characteristics are some the ____ _________ of a Process Control Plan
- 2. A drawing dimension/tolerance would be in which column of the PQCT?
- 3. The PQCT should be created using a ___ ______ Team
- 4. The format is which the data is recorded is the ____.
- 5. The PQCT is considered a ____ document.
- 7. ______ are responsible for creating and maintaining PQCTs for all Honda parts.
- 8. Lack of linkage to the ____ is a common mistake seen with PQCT.