PRELIMINARY WORK
Across
- 2. A layer of 50 to 75mm thick of weak/lean concrete or coarse sand.
- 3. Disturbed samples can be obtained by using a rotary flight auger fixed to a tripod.
- 5. The site contour to consider in selecting a suitable foundation for a building.
- 6. The base on which a building rests.
- 10. It is required in the first task of setting out.
- 11. It should be strong enough to support the load of wet concrete.
- 12. The last sequence in construction of RC foundation
- 14. Small concrete ___ as spacer to provide concrete cover to reinforcement.
- 15. Site ___ is to collect systematically and record data required for the design and construction processes of the proposed work.
- 16. Placing of concrete by carrying with tower crane
- 17. Equipment use to check the establishment of a right angle in setting out.
- 19. The temporary supports to the sides of the excavation.
- 20. It is constructed with raft foundation of a 4.5m thick and supported by 104 piles varying from 60 to 115m in length.
Down
- 1. It must have tensile strengt and easily bent to any required shape.
- 4. Formwork must have grout-tight joints to prevent ____.
- 7. The removal of topsoil is called ___ excavation.
- 8. After site clearance and setting out, the contractor shall set up access, security, services, etc.
- 9. Minimum amount of soil removed is the advantage of this trench excavation.
- 13. This sheeting is used for trench timbering of loose wet soils.
- 18. Type of excavation with isolated holes primarily for column stumps, pad footings, pile caps, and basements.