PSF - Walk the line
Across
- 5. Non-permanent piping that must be carefully inspected
- 6. Change in system configuration requiring verification
- 8. Period when system may degrade or change condition
- 9. Main objective of walking the line in process operations
- 12. Device that controls process flow and must be checked for correct position
- 13. Physical verification of equipment condition
- 14. Substance injected into process systems
- 18. Physical place where equipment must be inspected during walk the line
- 20. Front-line person responsible for verifying system readiness
- 21. Equipment that should not be started before verifying line-up
- 25. Person guiding operators during walk the line
- 26. Safety device protecting equipment from overpressure
- 28. System used for safe disposal of excess hydrocarbons
- 30. Flammable fluid handled in FPSO process systems
Down
- 1. Coordination between control room and field operators
- 2. Opening that may release gas to atmosphere if not checked
- 3. Work activity after which system line-up must be verified
- 4. Person responsible for ensuring training and safety culture
- 7. Uncontrolled escape of hydrocarbon from process system
- 10. Flexible pipe used for temporary transfer operations
- 11. When walk the line is required before operating equipment
- 15. Major hazard caused by incorrect hydrocarbon system line-up
- 16. Correct positioning of valves and equipment in a system
- 17. Process parameter that must remain within safe limits
- 19. Valve that if left open can cause hydrocarbon release
- 22. Action of closing valves to separate equipment
- 23. Action of confirming system readiness before operation
- 24. Diagram used to verify system layout during walk the line
- 27. Movement of fluids through pipes that operators must understand
- 29. Transfer operation requiring walk the line before starting