Rural Electrical Administration

1234567
Across
  1. 3. REA.
  2. 5. There was more than 380,000 miles layed out.
  3. 6. Total miles of cable.
  4. 7. Lowest cost per mile.
Down
  1. 1. The President at the time.
  2. 2. The date the program was started.
  3. 4. What the REA focused on.