Safety Crossword Puzzle

123456789101112131415161718192021
Across
  1. 2. ______________ must be kept in multiple locations on site and recertified annually
  2. 4. We perform a documented _____________ of all unplanned incidents
  3. 6. _________ increases Safety risks when the work is behind schedule
  4. 7. In our role we must ____________ the activities of Trade Contractors, for example to prevent over / under work hazards
  5. 8. Whether as General Contractor or Construction Manager we are usually the _________ Contractor for Safety on our project sites
  6. 10. We use disinfectant spray to ___________ high-touch surfaces
  7. 12. , ____________ increases Safety risks when tasks are routine and methods are unchanged for long durations
  8. 15. In an emergency we proceed to the ___________ point
  9. 16. Good ___________ always reduces risks of incidents and injuries
  10. 17. Tools and equipment shall only be repaired by a __________ person
  11. 19. , Within our roles, each of us must show Due ___________ toward our Safety responsibilities
  12. 21. Appropriate eyewear when working with airborne dust is ____________
Down
  1. 1. A cartridge _____________ is required when working with organic vapours / volatile organic compounds
  2. 3. Special work access, equipment, and crew requirements are required when the work space is _________
  3. 5. Equipment operators require a ___________ documenting that the relevant training has been completed
  4. 9. Exit corridors and stairs require minimum levels of ____________
  5. 10. , __________ dust must be managed carefully to prevent long-term lung damage and industrial disease
  6. 11. Twice per day we must perform a documented _____________ of the project site
  7. 13. We use a __________ of controls to mitigate risks in an effective and logical manner
  8. 14. The finest type of filter available for vacuums
  9. 18. __________ increases Safety risks toward the end portion of work shifts or during overtime
  10. 20. , Many types of ____________ are available as PPE, depending on the nature of the task