September 2025

123456789101112
Across
  1. 3. Electrical hazards, flooding, and unstable structures may remain ___ threats.
  2. 6. Florida and other ___ regions face a heightened risk during hurricane season.
  3. 8. Before leaving the site, ensure all ___ materials are stored.
  4. 9. ___ systems must be shut down safely, drainage paths cleared, and evacuation routes identified.
  5. 10. Personal ___ is equally important.
  6. 11. Damages should be ___ promptly for reporting and insurance purposes.
  7. 12. Crews should establish an Emergency Action ___.
Down
  1. 1. ___ begins long before a storm makes landfall.
  2. 2. Construction sites are more ___ during hurricane season.
  3. 4. Once the storm has passed, no work should resume until a thorough safety ___ has been completed.
  4. 5. Before leaving the site, ensure all personnel are ___ for.
  5. 7. Only ___ can issue the all-clear for re-entry.