Sequence safety
Across
- 3. Used when filling above shoulder height
- 6. The colourful discs
- 10. The process of filling on the shop floor
- 11. Needed when moving H-cages and Z-rails
Down
- 1. Putting overstock products into reserves
- 2. Takes care of the shop floor when decant is in process
- 4. Used when filling lower shelves
- 5. To be done before sequence and decant
- 7. Pink disc placed on every H-cage or Z-rail that needs merchandise protecting
- 8. Used to cut cardboard
- 9. Removes/delivers equipment for the sequence team