Spec Ops 2025

123456789101112
Across
  1. 8. This is generated in Oracle (then saved in TWO locations)
  2. 9. Location a worked exception email is moved too
  3. 10. What part do we always ship with every order except 2 types of jobs?
Down
  1. 1. What part do we always ship with one 1 type of order?
  2. 2. A day need by dates can never be
  3. 3. Long version of PNPR
  4. 4. The amount of attempts we make for parts pending scheduled process
  5. 5. This should be 1 day before the scheduled appointment, but never on a weekend
  6. 6. These dropship requests are found in MMB and are not worked by our BOT
  7. 7. Location of our jobs to work
  8. 11. Items we order
  9. 12. These dropship requests are found in Smartsheet and are not worked by our BOT