Supplication

12345678910111213141516171819202122
Across
  1. 6. MUST PERSONALLY INSPECT ALL TANKS AND VOIDS
  2. 12. RESPONSIBLE FOR THE PROPER CARE, STOWAGE, USE OF FUEL AND LUBE OILS
  3. 14. THE FINAL QUALIFYING AUTHORITY FOR EDO
  4. 16. REPAIRS THE ENGINEERING OFFICER MUST PERSONALLY INSPECT ALL GAS TURBINES AFTER _______ ______ _______
  5. 17. AS AN ENGINEER, IF YOU FALL YOU HAD BETTER FALL ___________
  6. 19. OVERSEE THE ADMINISTRATION OF THE DC PQS PROGRAM
  7. 20. USERS GUIDE GOVERNING DOCUMENT FOR DEVIATIONS FROM EOSS
  8. 21. CO AUTHORIZATION IS VALID FOR REPEATED ENTRY INTO TANKS AND VOIDS ON OPENED AND CERTIFIED SO LONG AS THEY _________ ________
Down
  1. 1. SAFE PLANT OPERATING GUIDELINES ARE MAINTAINED IN _________
  2. 2. GRANTED SIGNATURE AUTHORITY FOR THE ENGINEERING LOG DURING THE INPORT DUTY PERIOD
  3. 3. DAMAGE CONTROL OFFICER
  4. 4. ASSIGNS THE CO THE RESPONSIBILITY OF THE SAFE AND PROPER SUPERVISION, OPERATION, AND MAINTENANCE OF THE ENGINEERING PLANT.
  5. 5. ALL BREAKERS MUST BE LEFT IN THE ON POSITION UNLESS _______ _________
  6. 7. IN THE ABSENCE OF THE CHENG THE CO MUST AUTHORIZE VIA LETTER OF DESIGNATION OR ___________ _________ _________ THE MPA OR QUALIFIED PERSONS TO PERFORM CG/SG CLOSE OUT
  7. 8. USED BY THE CHENG TO ISSUE INSTRUCTIONS FOR CONDUCT OF ROUTINE AND SPECIAL EVOLUTIONS PLANNED FOR THE EVENINGS.
  8. 9. UNDER THE CHENG THERE WILL BE OFFICERS AND SENIOR ENLISTED PERSONNEL SUCH AS THE MPA, DLCPO, AUXO….
  9. 10. LIMIT THE IMPACT OF AND CONTROL BATTLE DAMAGE
  10. 11. SUPERVISE THE PREPARATION OF THE DAILY FUEL AND WATER REPORT
  11. 13. ENSURE PROPER ADMINISTRATION, SUPERVISION AND REGULATION OF THE ERO09 WORK CENTER
  12. 15. RESPONSIBLE FOR THE COLLECTION AND STORAGE OF ENGINEERING RECORDS AND LOGS
  13. 18. SPARE BREAKER POSITION
  14. 22. COMLCSRONTWOINST 3540.4