Technimark 2023
Across
- 1. What do we call our decoration workcells?
- 4. What do you run through the PMC to ensure it is catching defects?
- 9. What is the unit that houses and moves the tray stacks by trays called?
- 10. What closure do we make on E1?
- 12. What is our goal OEE %?
- 14. If we have a defect with extra material, what is it called?
- 16. What do we do when we manually put bottles or caps into a tray stack?
- 18. What is the dish closure called?
- 19. We (blank) each and every one of you!
- 20. What are our part numbers called?
Down
- 2. This is a living document that outlines the methods for quality control.
- 3. What are the units called that control our water temperature?
- 5. What city do we ship our 20MM applicator to?
- 6. For all your efforts, I want to say?
- 7. We make a GREAT (blank)!
- 8. What always comes first?
- 11. 99% of our defects are?
- 13. What does PMC stand for?
- 15. What is our target OEE %?
- 17. What are the plastic pellets called used to make our closures?