WEEKEND PROJECT CAR
Across
- 7. Install fresh electrical wiring
- 8. Stamped steel cabin floor section
- 11. Rough-styled custom build
- 13. Moved to the shop on a trailer
- 15. Abrasive rust-removal method
- 17. Stop leaks with new seals
- 18. Complete replacement motor package
- 20. Custom lowering body modification
- 22. Thin decorative paint line
- 23. Donor vehicle for spares
- 26. Full disassembly before repairs
- 27. Assembled frame without full body
- 29. Fabric under the roof panel
- 30. Temporary weld before final joining
- 31. Raised hood near the windshield
- 32. Protected against corrosion
Down
- 1. Able to move under its own power
- 2. Modified rear chassis section
- 3. Coated before final paint
- 4. Padded top of a dashboard
- 5. Metal-joining shop machine
- 6. Lifting chain for an engine pull
- 9. Place to hunt old car parts
- 10. Replacement section for rust repair
- 12. Project shell that still rolls
- 14. Wheel offset-related measurement
- 16. Rubber or poly suspension cushions
- 19. Apply fresh chrome finish again
- 21. Long-stored project car discovery
- 24. Decorative ring on a wheel or light
- 25. Updated classic build
- 28. Fabricating or repairing steel panels