The Procurement Puzzle

12345678910111213141516
Across
  1. 3. The "B" in IFB
  2. 8. An RFP requires an evaluation _____, but a DQ does not
  3. 9. Minimum days an IFB is posted
  4. 10. Type of IFB project that has no protest period
  5. 14. RFP posting time is measured in _____ days
  6. 16. In an RFP, specifications are _____ known
Down
  1. 1. You can do this in an RFP, but not in an IFB
  2. 2. In an IFB, specifications are fully _____
  3. 4. Minimum days a DQ is posted
  4. 5. The "P" in RFP
  5. 6. Minimum calendar days an RFP is posted
  6. 7. DQ decision is mainly based on _____
  7. 11. Business days for the protest period on an RFP or IFB
  8. 12. Mandatory signed document for RFP evaluators
  9. 13. The "Q" in DQ
  10. 14. Services in an RFP result in a State _____
  11. 15. IFB is awarded based on the _____ cost