Topaz CW #12
Across
- 5. Mud Engineer with a GOOD name
- 6. Cards used on the topaz for safety observations
- 7. Phase of the well done after the completions is done
- 8. Used to take the crew from Surabaya to the rig
- 10. Phase of the well started once the drilling is done
- 13. Used to circulate the well while drilling
- 14. Used on the rig floor to make up BHA connections
Down
- 1. Weekly Sunday event
- 2. Type of rig the Topaz is
- 3. Produced by REACH weekly to let everyone know how the rig is doing
- 4. The Doctor presented this bad habit at the last safety meeting
- 5. What we are drilling with in the 8 1/2" section
- 9. The person who has to call 333 the most!
- 11. Type of flying insect that can injure you if you swat it on your body
- 12. Type of completion on Z6
- 15. What we are drilling for on this platform