Unit 202 revision

1234567891011121314151617181920212223242526272829303132333435363738394041424344454647
Across
  1. 3. Internal walls are typically made using metal and ..... studwork.
  2. 4. What is shown in fig 9?
  3. 7. ........ isocyanurate, type of insulation.
  4. 8. What does the drawing symbol in fig.7 represent?
  5. 11. A point from which site levels are taken.
  6. 14. Type of foundation at fig..
  7. 15. Brick bond fig 13
  8. 16. ........ works permit needed when work will produce heat.
  9. 17. ...... drawing show greater detail show what a component looks like, scale 1:200, 1:100, 1:50, 1:10 and 1:5
  10. 19. A short note let typically as a reminder.
  11. 20. Work done for a private client.
  12. 21. An insulation from recycled jeans.
  13. 24. A deep foundation to support columbs fig 12.
  14. 25. Damp proof ..... used under floor to stop damp.
  15. 26. ..... trader. A company consisting of one person.
  16. 30. Construction work done for the government.
  17. 34. A type of construction work.
  18. 36. ..... statement will give information on how to do a task safely.
  19. 38. .... range drawing gives range of components from a manufacturer with sizes and for coding purposes.
  20. 39. The ..... assessment will provide information on safe working practises.
  21. 42. The term use for construction work when building houses is call ... work.
  22. 43. ......... company consisting of 250 or more persons.
  23. 44. A type of foundation running along and under the walls of a structure.
  24. 45. Name of the professional who designs and draws buildings and structures.
  25. 46. ....... Surveyor will oversee the installations of services such as gas, electric and water.
  26. 47. Brick bond found at fig.14.
Down
  1. 1. ..... plan give detail on work area and surrounding area.
  2. 2. What type of pitched roof is shown in fig 4
  3. 5. What does the drawing symbol in fig.6 represent?
  4. 6. Damp proof...... for stopping moisture in walls.
  5. 8. What drawing is shown in fig.5?
  6. 9. What type roof is shown in fig.1?
  7. 10. The site agent informs you that the walls are to have a gypsum based finish. What type of finish would this be?
  8. 12. The size of a company consisting of 50 to 249 persons.
  9. 13. What type of roof is shown in fig.3
  10. 17. Gives detail additional to the drawing.
  11. 18. In a mortar mix of 1:5 the 1 represents ........
  12. 22. .... plans show the building plot in more detail scale 1:200 and 1:500.
  13. 23. ........ Surveyor will calculate costs of on-going work and payment for work done.
  14. 27. ....... drawing will give details of site building plot and areas within a building.
  15. 28. What does the drawing symbol in fig.8 represent?
  16. 29. ...... order will document changes from the drawing and work schedule.
  17. 30. Foundation used to support brick and steel stanchions at fig 11.
  18. 31. The person who checks the land for building on.
  19. 32. ......... of works gives start, end and length of each construction activity.
  20. 33. ....... order used to get materials from a central store.
  21. 35. The ......... engineer who oversees the structure and strength of a building
  22. 37. A motor mix consists of cement and ...... aggregate.
  23. 40. Programme of .... will give information on when materials should be delivered.
  24. 41. What does the drawing symbol in fig.8 represent?
  25. 47. What is the volume of a trench measuring 1m deep by 2m wide and 3m long