unit 4.04.02: Framing Procedures
Across
- 2. These are nailed to the top plate at the top.
- 6. This is the first part of the framing to be installed
- 7. In platform framing, floor joists are __ to a header which is attached on top of sills.
- 11. Most buildings use __ framing because the subfloor gives a platform to stand on while adding the framing parts above it.
- 12. In conventional or “stick built” buildings, this is where rafters and other roof framing are built
- 13. Safety rules and __should always be followed.
- 14. If the local building codes require permits, they should be obtained __ construction begins.
- 15. what are platform and balloon two methods of?
Down
- 1. When __ framing is used, there is no subfloor or platform to stand on
- 3. Wall studs are nailed to this at the bottom
- 4. Total rafter ______ includes the unit length plus the tail or overhang.
- 5. In platform framing, the wall studs are __to the top plate and the sole plate. The plates should be the same width as the studs.
- 8. metal anchors are used to strengthen the __ of framing parts to each other so that toe nailing is reduced or eliminated.
- 9. joist hangers, which are used to connect floor joists, eliminate the need for this
- 10. These are built off-site and erected so that the rafter, braces, and other roof framing are erected in one piece
- 13. this is the type of framing used when a building is framed from the bottom to the top.